jenna.butterfly.welcome

Posts Tagged ‘civil engineering

Executive Summary

This design brief is for the construction of a Modular Floating Bridge (herein referred to as the “MFB”) for the region of Tonle Sap, Cambodia.  We have used the Product Development Lifecycle (PDLC) model to detail the complete process of bringing the MFB to the Cambodian market.

An attempt has been made to combine the most up-to-date Civil Engineering techniques, with the latest Harvard Business School analysis, to come up with a solution that is both innovative as well as achievable.  With superior knowledge of Cambodia, we structured a solution to bring a bridge that would be easily understood, as well as manufactured by the people of the Tonle Sap.

Our engineering solution is best summarized by the Chinese proverb:

Economical; Exquisite; Excellent

The MFB is supreme from the perspectives of price, exterior design, and interior design (manufacturing quality).

Brief Overview

The MFB Design Brief features the following:

v  Outlines alternative options during the design process, and justification for the selected technology

v  Provides detail of conceptual design, analysis, and final design

v  Considerations for budget (design, construction, and maintenance costs)

v  PESTLE Analysis (political, economic, social, technological, legal, environmental) of the Tonle Sap in Cambodia

v  Ethics, long-term sustainability, and maintenance considerations

v  Implementation strategy describing construction and operation advice to cast members

In short, the Modular Floating Bridge (referred to as the “MFB”) is an independent floating/bridging system that “plug-and-play’s” with existing Cambodian infrastructure, with “hot-swap” speeds, taking into account possible boats that may need to cross through the MFB.  The design uses materials that are 100% native to Cambodia, with the exclusion of the steel brackets, which can nonetheless be manufactured in Cambodia.

Advertisements

I guess you can call this a bit of an ‘Internet leak’, maybe more so a ‘news leak’ (Dictionary definition- disclosure of embargoed information in advance of its official release, or the unsanctioned release of confidential information).

Anyway, this seems to have not been an officially authorized disclosure, but somehow it may be in public interest due to need for speedy publication, which is the excuse I’m going to use today my good friends!!

Disclaimer: I’m not facilitating this leak by doing any journalists a personal favor (for any exchange of cooperation etc) but if any lawyers start coming to me screaming for why confidential intellectual property was released on to the Internet, you agree by looking at this page not to talk about it or pursue further charges!

I’ve attached the PDF, but since it’s 2.7MB it’s a bit big so for those who don’t mind not having the pictures, I’ll upload everything in Word format, etc, etc.

Be back very soon my good friends… You are doing a good deed helping the very very veeeeeeeeeeeery poor people of Cambodia!

Link: Modular Floating Bridge Design Brief (2009) [PDF]